Institutional study for Mumbai resettlement and rehabilitation: vol. 1 : main report (Record no. 10573)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02178nam a2200181Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 211202s9999 xx 000 0 und d |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | 307.344 |
Item number | MUM |
245 #0 - TITLE STATEMENT | |
Title | Institutional study for Mumbai resettlement and rehabilitation: vol. 1 : main report |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Place of publication, distribution, etc | Mumbai |
Name of publisher, distributor, etc | Tata institute of social science |
Date of publication, distribution, etc | 0 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | 118p. |
500 ## - GENERAL NOTE | |
General note | Includes references and glossary. |
504 ## - BIBLIOGRAPHY, ETC. NOTE | |
Bibliography, etc | 2. Recent R and R experiences<br/> a) R&R in Developing countries<br/> b) R&R in India<br/> c) R&R in MMR - The context<br/> d) Recent R&R projects in MMR<br/> e) Lessons obtained from review of cases<br/> f) Critial requirements of future R&R<br/><br/>3. Existing R&R framework and institutional capacity<br/>a) R&R activities in the past<br/>b) The legal framework<br/>c) Existing R&R process<br/>d) Assessment of institutions<br/>e) Summary<br/><br/>4.Comprehensive resettlement and rehabilitation<br/>a) R&R implications of development projects<br/>b) Evolution of an R&R policy<br/>c) Complexities of R&R in urban infrastructure development<br/>d) The R&R process<br/>e) Critical elements of successful R&R<br/>f) Strengthening the R&R process<br/><br/>5. Strategic options of R&R<br/>a) Analysis of critical factors<br/>b) Strategic options for R&R <br/>c) Comparitive assessment of strategic options<br/>d) Test of viability of suggested options<br/>e) Legal sanctions necessary<br/>f) Fitment of existing agencies in the R&R IF<br/>g) Involvement of the private sector in R&R IF<br/>h) The suggested R&R framework and MUTP-II<br/><br/>6. The proposed R&R framework and institutional strengthening<br/>a) Community participation: Protecting PAP rights<br/>b)The new institutional R&R framework<br/>c) The proposed R&R delivery system<br/>d) Private sector participation in R&R<br/>e) Provisions of GRs for R&R<br/>f) The proposed R&R organisation structure<br/>g) Recommended R&R process cycle<br/>h) Improvements in systems and procedures<br/>i) Capacity enhancement<br/>j) Capacity enhancement in FIs<br/>k) Capacity enhancement in NGOs<br/>l) Involvement of CBOs<br/>m) Training needs<br/>n) Training institutions |
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name as entry element | Rehabilitation |
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name as entry element | Slums redevelopment |
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name as entry element | Mumbai resettlement |
710 ## - ADDED ENTRY--CORPORATE NAME | |
Corporate name or jurisdiction name as entry element | Mumbai metropolitan region development authority |
942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
Item type | Reports |
Withdrawn status | Lost status | Damaged status | Not for loan | Permanent location | Current location | Date acquired | Total Checkouts | Full call number | Barcode | Date last seen | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|
YUVA Library | YUVA Library | 02/12/2021 | 307.344/MUM | RP00615 | 02/12/2021 | Reports |