Shah, Ashvin A.

Appeal for independent technical review of the World Bank-funded Narmada project - 0 0 0 - 91p. Illustrations, map ; 30*21 cm

A. Introduction

B. Overview of The Narmada River Basin Development project
1. Need for Technical Justification of the Project
2. Reexamination of Project Objectives
3. History of Environmental Degradation
4. Need to Redesign the Project
5. Siltation of Indian Dams and the Narmada Project Dams
6. Evaluation of Seismic Safety of the Sardar Sarovar Dam
7. The Basis for an Independent Technical Evaluation

C. Gujarat's Lifeline - Narmada Water or Rainwater?
1. Introduction
2. The Definition of Scarcity-Prone Area
3. Irrigation Needs in Gujarat
4. Command Area Rainfall and Scarcity
5. Lack of Water Policy in Gujarat
6. The Ideology of Big Dams in Gujarat
(a) A Meeting in Saurashtra
(b) A Debate on the U.S.National Public Radio (c) A Debate in Bhoomiputra
(d) Reservoir Capacity in Gujarat
(e) Conclusions on Ideology and Alternatives
7. A Case History of Rainwater Harvesting
8. A Case for Diverting Narmada Funds for Reclamation work
9. A Case for Restoring The Lost Lifeline of Groundwater
10. A Case for Greening Gujarat
11. Water Inventory of Gujarat and Narmada Water

D. Concluding Remarks

E. References

F. Figures 1 and 2


Narmada project
International bank

332.1532 / SHA
Urban Resource Centre (YUVA). All Rights Reserved. © 2021
Implemented and Customised by KMLC

Powered by Koha